Skip to main content

Project Management

The system provides a clear overview for managing projects and folders. The main view includes list and card layouts, quick filters, a search bar, and project and folder operations.

Advantage
Flexible views and quick filters make it easy to search and organise even large numbers of projects.

TreeDetect project management interface showing list and card view

Key Features

  • Create project: start a new processing project by entering a few basic details.
  • Create folder: create thematic containers for organising projects. Ideal for scheduling multiple surveys of the same area over time.
  • Switch view: choose between list or card view.
  • Filter and search: quick filters by location, type, and status + full-text search.

Views

List View

Columns: Name, Location, Photo/LiDAR (data source type), Created, Status, Actions.
All key commands are accessible from the actions menu at the end of each row. Clicking on a project row opens the project page.

Card View

Project basics are prominently displayed (description, location, role, type, creation date), with a status badge in the header.
An open button at the bottom of the card navigates to the project page.


  • Quick filters: Location, Type, Status (multiple conditions can be combined).
  • Search: by name and additional metadata.
  • Filter persistence: applied filters are retained when switching between views.

Statuses

  • Planning: project is under preparation
  • Processing: data processing is in progress
  • Report ready: all results and reports are available

Project and Folder Operations

The menu on the right side of each row/card:

  • Details: open the project's detail page (results, visualisations, files).
  • Share: share with users and set permissions.
  • Move: move the project to another folder.
  • Edit: modify basic data (name, description, type, etc.).
  • Delete: the project is moved to the Trash folder, where it can be restored or permanently deleted within 7 days. After 7 days, the project is automatically and irrevocably deleted.
Deleted project

⚠️ Warning
Projects permanently deleted from the Deleted folder, or automatically removed after the 7-day period, cannot be restored.


Data Source Type

  • LiDAR: processing based on georeferenced point cloud.
  • Photo: point cloud generated from photogrammetric processing.

The type is displayed in both list and card view, giving a quick overview of the project technology.